Research note · Equal-budget comparison

Can the same mission budget
measure more?

A real REMUS 100 mission trace and a frozen offline research candidate, evaluated over the same 28.394 km path budget. SPEX scores both routes; the planner proposes the candidate.

SPEX evaluates · The planner proposes

REMUS 100 · Makua H1 · Oʻahu · 06 Sep 2013 Historical mission Research candidate
0.906Historical mission · SPEX score
0.974Research candidate · SPEX score
+0.068Absolute score improvement
28.394 kmEqual path budget

Observed source REMUS H1 navigation traceSPEX-derived scores and residual fieldsPlanner output offline geometric candidate

Reading the run

Mission complete is not objective proven.

01 · Observed

Start from what happened.

The first trace is an observed REMUS H1 mission record. Its final SPEX score is 0.906 under the frozen evaluation protocol.

02 · Evaluated

Keep the budget equal.

The research candidate receives the same 28.394 km path budget. SPEX scores it at 0.974—an absolute improvement of 0.068.

03 · Blocked

Call the boundary.

The candidate is an offline geometric research result, not a route flown at sea or an operational vehicle-performance claim.

A result we did not hide

233.8 m looked better.
The run still did not win.

A mission-axis lawnmower baseline improved P95 residual from 236.0 m to 233.8 m, while mean and maximum residual worsened.

One metric improved Two deteriorated

Research access

Public evidence here. Guided dives by invitation.

This page remains a deliberately narrow public window—not a deployed capability or sea-trial claim. The interactive research environment is protected and used for scoped sessions with pilot, OEM and research partners.